盈丰彩票客户端

  • <tr id='PQa0LI'><strong id='PQa0LI'></strong><small id='PQa0LI'></small><button id='PQa0LI'></button><li id='PQa0LI'><noscript id='PQa0LI'><big id='PQa0LI'></big><dt id='PQa0LI'></dt></noscript></li></tr><ol id='PQa0LI'><option id='PQa0LI'><table id='PQa0LI'><blockquote id='PQa0LI'><tbody id='PQa0LI'></tbody></blockquote></table></option></ol><u id='PQa0LI'></u><kbd id='PQa0LI'><kbd id='PQa0LI'></kbd></kbd>

    <code id='PQa0LI'><strong id='PQa0LI'></strong></code>

    <fieldset id='PQa0LI'></fieldset>
          <span id='PQa0LI'></span>

              <ins id='PQa0LI'></ins>
              <acronym id='PQa0LI'><em id='PQa0LI'></em><td id='PQa0LI'><div id='PQa0LI'></div></td></acronym><address id='PQa0LI'><big id='PQa0LI'><big id='PQa0LI'></big><legend id='PQa0LI'></legend></big></address>

              <i id='PQa0LI'><div id='PQa0LI'><ins id='PQa0LI'></ins></div></i>
              <i id='PQa0LI'></i>
            1. <dl id='PQa0LI'></dl>
              1. <blockquote id='PQa0LI'><q id='PQa0LI'><noscript id='PQa0LI'></noscript><dt id='PQa0LI'></dt></q></blockquote><noframes id='PQa0LI'><i id='PQa0LI'></i>
                Wechat:
                • Wison Group

                • Wison Engineering

                • Wison Offshore & Marine

                Wison Commenced Construction of its Floating LNG-to-Power Project in Nantong Yard

                Release time:2021-01-26

                Wison Offshore and Marine (WOM) today announced that construction of 240MW Floating LNG-to-Power project, on which it invests and develops was commenced in its Nantong Yard, marking the official start of implementation of China’s first Floating LNG-to-Power project.

                 

                The floating LNG-to-Power project will consist of a floating LNG regasification unit (FSRU) and a 240MW combined cycle power barge. LNG will be regasified through the FSRU and transferred to the power barge as fuel for power generation, which will then be transmitted to the grid. WOM signed a contract with Shanghai Electric last year for the supply of turbines for the floating LNG-to-Power project.